Through Faith All Things are Possible
  • Water Reliability Studies with hydraulic modeling
  • SAW Grant Applications and Project Completion
  • Street Improvements through MDOT design and letting system
  • Street Improvements not through MDOT
  • 10,000 gallon per day on-site sewage disposal system for a private client
  • 10,000 gallon per day water supply system including aquifer analysis, potable water storage and booster pumping
  • Village of Minden City – Water Treatment Plant
  • Village of Minden City – Water Main Replacement
  • City of Sandusky Wastewater Treatment Plant Improvements, funded through Rural Development
  • City of Sandusky Arsenic/Iron Water Treatment Plant
  • City of Sandusky Raw Water Main for Treatment Plant
  • City of Sandusky Various Tasks Rate Study, Capital Charge
  • Review, NPDES Permitting, Industrial Pretreatment Program assistance, Aquifer Testing, Smoke Testing
  • Village of Minden City Arsenic Treatment, Aquifer Testing and USDA-RD Funding assistance
  • Village of Minden City 2006 Water Main replacement
  • Lagoon Liner Repair
  • 4.5 mile water main project crossing the Flint River
  • Hoist project at a Water Treatment Plant for removal of pumps
  • Sidewalk replacement projects
  • City of Marlette Water Tower Recoating
  • MILES of water main design in rural and urban settings
  • Sanitary Sewer Smoke Testing assistance in Sandusky and Marlette
  • Membrane water treatment plant in Saganing
  • MBR wastewater treatment plant in Saganing
  • Cemetery Mapping
  • Safe Routes to School application assistance, design and construction administration
Close Menu