{"id":55,"date":"2019-12-19T14:06:46","date_gmt":"2019-12-19T14:06:46","guid":{"rendered":"http:\/\/townleyengineering.com\/?page_id=55"},"modified":"2020-01-23T13:44:42","modified_gmt":"2020-01-23T13:44:42","slug":"list-of-projects","status":"publish","type":"page","link":"https:\/\/townleyengineering.com\/index.php\/list-of-projects\/","title":{"rendered":"List of Projects"},"content":{"rendered":"\n<ul><li>Water Reliability Studies with hydraulic modeling<\/li><li>SAW Grant Applications and Project Completion<\/li><li>Street Improvements through MDOT design and letting system<\/li><li>Street Improvements not through MDOT <\/li><li>10,000 gallon per day on-site sewage disposal system for a private client<\/li><li>10,000 gallon per day water supply system including aquifer analysis, potable water storage and booster pumping<\/li><li>Village of Minden City &#8211; Water Treatment Plant<\/li><li>Village of Minden City &#8211; Water Main Replacement<\/li><li>City of Sandusky Wastewater Treatment Plant Improvements, funded through Rural Development<\/li><li>City of Sandusky Arsenic\/Iron Water Treatment Plant<\/li><li>City of Sandusky Raw Water Main for Treatment Plant<\/li><li>City of Sandusky Various Tasks Rate Study, Capital Charge<\/li><li>Review, NPDES Permitting, Industrial Pretreatment Program assistance, Aquifer Testing, Smoke Testing<\/li><li>Village of Minden City Arsenic Treatment, Aquifer Testing and USDA-RD Funding assistance<\/li><li> Village of Minden City 2006 Water Main replacement<\/li><li>Lagoon Liner Repair<\/li><li>4.5 mile water main project crossing the Flint River<\/li><li>Hoist project at a Water Treatment Plant for removal of pumps<\/li><li>Sidewalk replacement projects<\/li><li>City of Marlette Water Tower Recoating<\/li><li>MILES of water main design in rural and urban settings<\/li><li>Sanitary Sewer Smoke Testing assistance in Sandusky and Marlette<\/li><li>Membrane water treatment plant in Saganing<\/li><li>MBR wastewater treatment plant in Saganing<\/li><li>Cemetery Mapping<\/li><li>Safe Routes to School application assistance, design and construction administration<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Water Reliability Studies with hydraulic modeling SAW Grant Applications and Project Completion Street Improvements through MDOT design and letting system Street Improvements not through MDOT 10,000 gallon per day on-site sewage disposal system for a private client 10,000 gallon per day water supply system including aquifer analysis, potable water storage and booster pumping Village of [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/55"}],"collection":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=55"}],"version-history":[{"count":3,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/55\/revisions"}],"predecessor-version":[{"id":155,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/55\/revisions\/155"}],"wp:attachment":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=55"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}