{"id":25,"date":"2019-11-29T21:52:30","date_gmt":"2019-11-29T21:52:30","guid":{"rendered":"http:\/\/townleyengineering.com\/?page_id=25"},"modified":"2019-12-20T15:41:24","modified_gmt":"2019-12-20T15:41:24","slug":"servicelist","status":"publish","type":"page","link":"https:\/\/townleyengineering.com\/index.php\/servicelist\/","title":{"rendered":"Service List"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Studies<\/strong><\/h2>\n\n\n\n<ul><li>Asset Management for Water and Sewer<\/li><li>Arsenic Treatment Feasibility<\/li><li>Wastewater Treatment Feasibility<\/li><li>NPDES Permit Applications and Negotiations<\/li><li>Treatment Capacity Evaluations<\/li><li>Water and Sewer Rate Evaluations<\/li><li>Combined Sewer Overflow (CSO) Facility Evaluations<\/li><li>Sanitary Sewer Overflow Correction Programs<\/li><li>Inflow and Infiltration Determinations<\/li><li>Sanitary Sewer Collection District Sizing<\/li><li>Sanitary Sewer Pump Station Capacity Calculations<\/li><li>New Equipment Evaluations (including Present Worth Comparisons)<\/li><li>Capital Improvement Plan for Water, Sewer, and Treatment<\/li><li>Project Financing Evaluation<\/li><li>Water Reliability Studies<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Design<\/strong><\/h2>\n\n\n\n<ul><li>Water Treatment Plans<ul><li>Membrane <\/li><li>Pressure Filter<\/li><li>Gravity Filter<\/li><\/ul><\/li><li>Wastewater Treatment Plants<ul><li>Fixed Film<\/li><li>Activated Sludge with or without Membranes<\/li><li>Lagoons<\/li><\/ul><\/li><li>Pump Stations<ul><li>Wastewater<\/li><li>Water Boosting<\/li><\/ul><\/li><li>Watermain<ul><li>Open Cut<\/li><li>Directional Drilling<\/li><\/ul><\/li><li>Sanitary Sewers<\/li><li>On-Site Sewage Disposal<\/li><li>Wells and Aquifer Testing<ul><li>New<\/li><li>Upgrades <\/li><\/ul><\/li><li>Chemical Feed Systems<\/li><li>Fountains<\/li><li>Parking Lots<\/li><li>Street Improvements<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Project Management<\/strong><\/h2>\n\n\n\n<p>If you have a project that you simply need someone to manage the contractual, technical aspects and to provide communication between the team members we can help.&nbsp; Recent projects include: <\/p>\n\n\n\n<ul><li>Safe Routes To School (Sidewalks Serving Schools)<\/li><li>Marina Preliminary Engineering Study and Design<\/li><li>MEDC Funded Paths<\/li><li>USDA ","protected":false},"excerpt":{"rendered":"<p>Studies Asset Management for Water and Sewer Arsenic Treatment Feasibility Wastewater Treatment Feasibility NPDES Permit Applications and Negotiations Treatment Capacity Evaluations Water and Sewer Rate Evaluations Combined Sewer Overflow (CSO) Facility Evaluations Sanitary Sewer Overflow Correction Programs Inflow and Infiltration Determinations Sanitary Sewer Collection District Sizing Sanitary Sewer Pump Station Capacity Calculations New Equipment Evaluations [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"_links":{"self":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/25"}],"collection":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/comments?post=25"}],"version-history":[{"count":6,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/25\/revisions"}],"predecessor-version":[{"id":149,"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/pages\/25\/revisions\/149"}],"wp:attachment":[{"href":"https:\/\/townleyengineering.com\/index.php\/wp-json\/wp\/v2\/media?parent=25"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}